Eastside Treatment Plant Outfall Replacement

ProjectEastside Treatment Plant Outfall Replacement
Date2018
LocationWashington Narrows, Bremerton, WA
Contract$1,700,000

Project Summary

Remove approximately 250 LF of an existing 20-inch outfall pipe and replace it with a new 36-inch outfall pipe.  The work includes sheet pile shoring, excavation, backfilling and the installation of an end diffuser check valve.

 